Consequence Map

Typical duration:
35m

A visual mapping exercise that traces the downstream consequences of a decision or action through multiple orders of effect to surface unintended impacts.

Purpose

A Consequence Map helps teams think beyond immediate outcomes by tracing first-, second-, and third-order consequences of a decision. By visualising the ripple effects, the group identifies unintended consequences, feedback loops, and hidden risks before committing to a course of action.

At a glance

AttributeDetail
Group size4–12 participants
Duration35 minutes
DifficultyMedium
Facilitation styleAnalytical, divergent
SettingIn-person or remote

How to run

  1. State the decision (3 min): Write the decision or action in the centre of the board.
  2. First-order consequences (8 min): Brainstorm the immediate, direct effects. Place them around the centre and draw arrows from the decision.
  3. Second-order consequences (10 min): For each first-order consequence, ask "And then what?" Place these further out and connect with arrows.
  4. Third-order consequences (8 min): Repeat once more. Look for surprises and feedback loops.
  5. Evaluate (6 min): Colour-code consequences as positive (green), negative (red), or uncertain (yellow). Discuss the most concerning negative consequences and whether they change the decision.

Materials needed

  • Large whiteboard or paper (the map expands quickly)
  • Sticky notes and markers
  • Three colours for coding (green, red, yellow)

Pitfalls & common mistakes

  • Stopping at first order: The real insights are in second- and third-order effects.
  • Too many branches: Focus on the most significant consequences at each level; not every branch needs to go three levels deep.
  • Analysis paralysis: The goal is awareness, not prediction of every outcome.
  • Ignoring positive consequences: Track upsides too, not only risks.

Inclusion & accessibility

  • Use large, clear arrows and labels for readability.
  • Allow participants to add consequences via sticky notes placed by the facilitator.
  • In remote settings, use a zoomable digital canvas.

Variations

  • Futures Wheel: A related technique by Jerome Glenn with a more structured radial layout.
  • So-What Chain: A simplified linear version asking "So what?" repeatedly.
  • Stakeholder Consequence Map: Separate branches per affected stakeholder group.

When NOT to use this

  • For reversible, low-stakes decisions — over-analysis adds no value.
  • When the team needs to move fast and the decision is time-sensitive.
  • When consequences are already well-documented from prior analysis.

Source & further reading

  • Jerome Glenn, "Futures Wheel" (1971)
  • Donella Meadows, *Thinking in Systems* (2008)
  • Gamestorming: Consequence Map

Turn the building blocks into an agenda

Create the day, drag the blocks into the order you have in mind, and let the times work themselves out. Or describe what you are planning to your AI and let it write the first draft.

Try it free for 14 days
Consequence Map · GoodWorkshop