Definition of Ready

Typical duration:
45m

A facilitated workshop where the team agrees on the criteria a Product Backlog item must meet before it can be pulled into a Sprint.

Purpose

The Definition of Ready (DoR) prevents half-baked work from entering a Sprint. By agreeing upfront on what "ready" means, teams reduce mid-Sprint surprises, scope creep, and carry-over.

At a glance

AttributeDetail
Group size3 – 12
Duration45 minutes
DifficultyMedium
Facilitation styleFacilitated discussion with consensus voting
SettingIn-person or video call with shared document

How to run

  1. Context (5 min) — Explain the purpose. Share examples of items that entered Sprints unready and the problems that followed.
  2. Brainstorm criteria (10 min) — Silent brainstorm: each person writes criteria on sticky notes.
  3. Cluster and discuss (15 min) — Group similar criteria. Discuss each: Is it essential? Is it practical to verify before Sprint Planning?
  4. Vote (5 min) — Dot voting or thumbs to reach consensus on each criterion.
  5. Write the DoR (5 min) — Formalize the agreed criteria.
  6. Agree on the process (5 min) — When and how will readiness be checked? (e.g., at Backlog Refinement, before Sprint Planning.)

Materials needed

  • Sticky notes and markers
  • Examples of ready vs. not-ready items from past Sprints
  • Whiteboard or digital collaboration tool

Pitfalls & common mistakes

  • DoR becomes a gate — It should be a guide, not a bureaucratic checkpoint that blocks all work.
  • Too many criteria — Keep it to 5–8 essential criteria. A 20-point checklist will be ignored.
  • Never updated — Review every quarter or when readiness problems persist.
  • PO does all the work alone — Readiness is a team responsibility; developers help refine items.

Inclusion & accessibility

  • Use silent brainstorming first to capture all voices.
  • Write criteria in plain language accessible to all roles.
  • Post the DoR visibly so new team members learn it immediately.

Variations

  • Combined DoR + DoD workshop — Run both back to back in a 90-minute session.
  • INVEST checklist — Use the INVEST criteria (Independent, Negotiable, Valuable, Estimable, Small, Testable) as a starting framework.
  • Traffic-light readiness — Rate each item as red/amber/green against the DoR at refinement.

When NOT to use this

  • If the team consistently pulls well-understood items into Sprints without issues — the DoR adds overhead without value.
  • If the DoR is being used to blame the PO for unready items — fix the culture first.

Source & further reading

  • Schwaber, K. & Sutherland, J. (2020). *The Scrum Guide*. scrumguides.org
  • Rubin, K. (2012). *Essential Scrum*. Addison-Wesley.