Definition of Ready
- Typical duration:
- 45m
A facilitated workshop where the team agrees on the criteria a Product Backlog item must meet before it can be pulled into a Sprint.
Purpose
The Definition of Ready (DoR) prevents half-baked work from entering a Sprint. By agreeing upfront on what "ready" means, teams reduce mid-Sprint surprises, scope creep, and carry-over.
At a glance
| Attribute | Detail |
|---|---|
| Group size | 3 – 12 |
| Duration | 45 minutes |
| Difficulty | Medium |
| Facilitation style | Facilitated discussion with consensus voting |
| Setting | In-person or video call with shared document |
How to run
- Context (5 min) — Explain the purpose. Share examples of items that entered Sprints unready and the problems that followed.
- Brainstorm criteria (10 min) — Silent brainstorm: each person writes criteria on sticky notes.
- Cluster and discuss (15 min) — Group similar criteria. Discuss each: Is it essential? Is it practical to verify before Sprint Planning?
- Vote (5 min) — Dot voting or thumbs to reach consensus on each criterion.
- Write the DoR (5 min) — Formalize the agreed criteria.
- Agree on the process (5 min) — When and how will readiness be checked? (e.g., at Backlog Refinement, before Sprint Planning.)
Materials needed
- Sticky notes and markers
- Examples of ready vs. not-ready items from past Sprints
- Whiteboard or digital collaboration tool
Pitfalls & common mistakes
- DoR becomes a gate — It should be a guide, not a bureaucratic checkpoint that blocks all work.
- Too many criteria — Keep it to 5–8 essential criteria. A 20-point checklist will be ignored.
- Never updated — Review every quarter or when readiness problems persist.
- PO does all the work alone — Readiness is a team responsibility; developers help refine items.
Inclusion & accessibility
- Use silent brainstorming first to capture all voices.
- Write criteria in plain language accessible to all roles.
- Post the DoR visibly so new team members learn it immediately.
Variations
- Combined DoR + DoD workshop — Run both back to back in a 90-minute session.
- INVEST checklist — Use the INVEST criteria (Independent, Negotiable, Valuable, Estimable, Small, Testable) as a starting framework.
- Traffic-light readiness — Rate each item as red/amber/green against the DoR at refinement.
When NOT to use this
- If the team consistently pulls well-understood items into Sprints without issues — the DoR adds overhead without value.
- If the DoR is being used to blame the PO for unready items — fix the culture first.
Source & further reading
- Schwaber, K. & Sutherland, J. (2020). *The Scrum Guide*. scrumguides.org
- Rubin, K. (2012). *Essential Scrum*. Addison-Wesley.
Turn the building blocks into an agenda
Create the day, drag the blocks into the order you have in mind, and let the times work themselves out. Or describe what you are planning to your AI and let it write the first draft.
Try it free for 14 days