Ecocycle Planning
- Typical duration:
- 1h
Purpose
Ecocycle Planning uses an ecological lifecycle metaphor to help groups see where their activities, projects, and practices sit in a natural cycle of birth, maturity, creative destruction, and renewal. It makes visible what should be started, what is thriving, what needs to be stopped, and what is ready for reinvention. Use it when a portfolio of activities feels cluttered, stale, or when resources are spread too thin.
At a glance
- Group size: 8–40 people
- Duration: 60 minutes
- Difficulty: Advanced
- Facilitation style: Structured
- Setting: Indoor / Remote-friendly
How to run
- Introduce the Ecocycle (5 min): Present the four phases: Birth (new, experimental), Maturity (established, productive), Creative Destruction (must be stopped or dismantled), Renewal (potential ready to be developed). Also show the two traps: Rigidity Trap (stuck in maturity, resisting change) and Poverty Trap (stuck in renewal, unable to launch).
- List activities (10 min): Each person writes their key activities/projects on sticky notes.
- Place on the cycle (15 min): Participants place each activity on the Ecocycle map. Discuss placements, especially disagreements.
- Identify actions (20 min): For each quadrant, decide: Birth → what needs investment? Maturity → what needs sustaining? Creative Destruction → what must stop? Renewal → what is ready to launch?
- Commit to moves (10 min): Assign specific actions, especially for the hardest moves (stopping things).
Materials needed
- Large printed Ecocycle diagram (infinity loop)
- Sticky notes and markers
- Timer
Pitfalls & common mistakes
- Avoiding the Creative Destruction quadrant — groups resist stopping things, but this is where the most important decisions live.
- Placing everything in Maturity — challenge the group to be honest about what is merely habitual versus truly productive.
- Not assigning owners to "stop" actions — without accountability, nothing gets stopped.
Inclusion & accessibility
- The visual metaphor makes strategic portfolio management accessible to non-analysts.
- Individual writing ensures all perspectives are represented before group discussion.
- For remote: use a digital Ecocycle template with drag-and-drop.
Variations
- Personal Ecocycle: Each person maps their own work portfolio.
- Ecocycle + TRIZ: Use TRIZ to identify what to stop, then place those items in Creative Destruction.
- Quarterly Ecocycle: Repeat every quarter as a portfolio review ritual.
When NOT to use this
Avoid Ecocycle Planning when the group has no authority to stop or start activities — the method requires decision-making power to be meaningful.
Source & further reading
Developed by Henri Lipmanowicz and Keith McCandless as part of Liberating Structures, based on the Panarchy framework (Holling, Gunderson). See liberatingstructures.com.