Post-Mortem
- Typical duration:
- 45m
A structured debrief held after a project or incident concludes to capture what went well, what went wrong, and lessons learned for the future.
Purpose
A Post-Mortem examines a completed project or incident to extract lessons. The goal is blameless learning: understand systemic causes, celebrate what worked, and create actionable improvements so the organisation does not repeat mistakes.
At a glance
| Attribute | Detail |
|---|---|
| Group size | 5–20 participants |
| Duration | 45 minutes |
| Difficulty | Medium |
| Facilitation style | Structured discussion |
| Setting | In-person or remote |
How to run
- Set the tone (5 min): Emphasise blamelessness. Review the timeline of events factually.
- What went well (8 min): Silent brainstorm on sticky notes, then share and cluster.
- What went wrong (10 min): Same format. Encourage root causes, not symptoms.
- Contributing factors (8 min): For each major issue, ask "Why?" up to five times (5 Whys).
- Lessons and actions (10 min): Convert insights into specific, owned action items with deadlines.
- Close (4 min): Summarise top 3 lessons. Agree on how to share findings with the wider organisation.
Materials needed
- Timeline of events (prepared in advance)
- Sticky notes and markers
- Whiteboard or digital board
- Action-item tracker
Pitfalls & common mistakes
- Blame culture: If people feel attacked, they withhold information. Enforce blamelessness explicitly.
- Too soon or too late: Run within 1–2 weeks of the event while memory is fresh.
- No actions: A post-mortem without follow-through is theatre. Assign owners and review.
- Scope explosion: Keep it to one project or incident per session.
Inclusion & accessibility
- Share the timeline in advance so participants can prepare.
- Use silent writing before discussion to include quieter voices.
- Record the session (with consent) for those who cannot attend.
- Provide a written summary afterward.
Variations
- Incident Post-Mortem (SRE style): Focuses on technical root cause, detection time, and remediation.
- Appreciative Post-Mortem: Starts with successes and builds on strengths.
- Timeline Walk: Physically walk along a timeline taped to the wall, adding notes at each phase.
When NOT to use this
- During an ongoing crisis — stabilise first, debrief later.
- When the team is emotionally raw — allow a cooling-off period.
- For trivial events that do not warrant a 45-minute session.
Source & further reading
- Etsy, "Blameless PostMortems and a Just Culture" (Code as Craft blog)
- US Army After Action Review (AAR) framework
- Norman Kerth, *Project Retrospectives* (2001)