All methods

Power/Interest Grid

Typical duration:
25m

A stakeholder analysis tool that maps individuals or groups on a 2x2 matrix of power (influence) and interest (engagement) to determine the right communication strategy for each.

Purpose

The Power/Interest Grid helps project teams identify their stakeholders and calibrate engagement strategies. By plotting each stakeholder on a 2×2 of power (ability to influence the project) and interest (level of concern about the outcome), the team knows who to manage closely, keep satisfied, keep informed, or simply monitor.

At a glance

AttributeDetail
Group size3–12 participants
Duration25 minutes
DifficultyEasy
Facilitation styleAnalytical, collaborative
SettingIn-person or remote

How to run

  1. List stakeholders (5 min): Brainstorm all individuals and groups affected by or able to affect the project.
  2. Draw the grid (1 min): X-axis = Interest (low to high), Y-axis = Power (low to high). Label quadrants: Monitor (low/low), Keep Informed (high interest/low power), Keep Satisfied (low interest/high power), Manage Closely (high/high).
  3. Plot stakeholders (12 min): Place each stakeholder on sticky notes and position them on the grid collaboratively.
  4. Define strategies (5 min): For each quadrant, agree on the communication approach: frequency, channel, depth.
  5. Assign relationship owners (2 min): For key stakeholders, assign a team member to manage the relationship.

Materials needed

  • Large 2×2 grid on whiteboard or flip chart
  • Sticky notes with stakeholder names
  • Markers

Pitfalls & common mistakes

  • Forgetting internal stakeholders: IT, finance, legal, and HR can have high power.
  • Static placement: Stakeholder positions shift over time. Revisit quarterly.
  • Treating all stakeholders the same: The whole point is differentiated engagement.
  • Making it public: The grid can be politically sensitive. Keep it internal to the project team.

Inclusion & accessibility

  • Ensure the brainstorm includes voices from different departments and levels.
  • Use anonymous input for politically sensitive stakeholder assessments.
  • Make the grid large enough for all to interact with.

Variations

  • Stakeholder Salience Model: Three dimensions: power, legitimacy, urgency.
  • Influence/Impact Grid: Reframes power as influence and interest as impact.
  • Stakeholder Onion Diagram: Concentric circles showing proximity to the project.

When NOT to use this

  • When the stakeholder landscape is tiny (fewer than 5 stakeholders).
  • When stakeholder management is already mature and documented.
  • When the team lacks the political awareness to map stakeholders accurately — consider external input.

Source & further reading

  • Aubrey Mendelow, stakeholder analysis (1991)
  • Project Management Institute (PMI)
  • MindTools: Stakeholder Analysis

Turn the building blocks into an agenda

Create the day, drag the blocks into the order you have in mind, and let the times work themselves out. Or describe what you are planning to your AI and let it write the first draft.

Try it free for 14 days