All methods

Powers of Ten

Typical duration:
25m

A perspective-shifting exercise that examines a problem at multiple scales — from individual to planetary — to uncover systemic connections and reframe the challenge.

Purpose

Powers of Ten (inspired by the Eames film) forces teams to zoom in and out on a problem across multiple scales. By examining the same challenge at the level of one person, a team, an organisation, a city, and a society, teams discover systemic connections, leverage points, and blind spots they would miss at a single scale.

At a glance

  • Group size: 4–12
  • Duration: 25 minutes
  • Difficulty: Moderate
  • Facilitation style: Facilitator-guided discussion through scale levels
  • Setting: Workshop room with whiteboard showing concentric circles or columns

How to run

  1. State the challenge (3 min): Write the design challenge in the centre.
  2. Define scales (2 min): Mark 4–6 scale levels around it. Typical scales: Individual > Team > Organisation > Industry > Society > Planet.
  3. Explore each scale (15 min, ~3 min per scale): At each level, ask: "How does this problem manifest here?" "Who is affected?" "What forces operate?" "What solutions exist at this scale?" Capture answers on sticky notes.
  4. Connect across scales (5 min): Draw arrows between scales where forces influence each other. Identify where a small intervention at one scale could create change at another.

Materials needed

  • Whiteboard or large paper with concentric circles
  • Sticky notes and markers
  • Scale level labels

Pitfalls & common mistakes

  • Staying comfortable at one scale: Teams default to their usual level (often team or product). Push deliberately to unfamiliar scales.
  • Making it too abstract: Keep each scale grounded with specific examples and real actors.
  • Skipping the connections: The value is in seeing how scales interact, not just listing concerns at each level.
  • Too many scales: 4–6 is enough. More becomes unwieldy.

Inclusion & accessibility

  • Label scales clearly and read them aloud.
  • Use different colours for different scales to aid visual parsing.
  • Allow individual reflection time at each scale before group discussion.

Variations

  • Temporal powers of ten: Instead of spatial scales, zoom through time: now, 1 month, 1 year, 10 years, 100 years.
  • Stakeholder powers of ten: Use stakeholder groups as scale levels instead of geographic scope.
  • Reverse powers of ten: Start at the planetary scale and zoom in to the individual.

When NOT to use this

  • When the challenge is tightly scoped and multi-scale thinking would introduce unnecessary complexity.
  • When the team needs to converge, not diverge — this is an expansive exercise.
  • When no one in the room has knowledge of the broader systems — provide reference material.

Source & further reading

  • Eames, Charles & Ray — *Powers of Ten* (film, 1977)
  • d.school, Stanford — "Powers of Ten" method card
  • Meadows, Donella — *Thinking in Systems* (Chelsea Green, 2008)

Turn the building blocks into an agenda

Create the day, drag the blocks into the order you have in mind, and let the times work themselves out. Or describe what you are planning to your AI and let it write the first draft.

Try it free for 14 days
Powers of Ten · GoodWorkshop